Interior Painting and Wallpaper Removal Case Study in O’Fallon – Final Phase Refresh in O'Fallon

This interior painting and wallpaper removal case study highlights the final phase of a long-term, full-interior project completed in O’Fallon, MO in the Villas at Dardeen Prairie neighborhood. Over the past year, the Elledge family completed their home in planned phases, and this final step focused on two bedrooms and the hall bathroom. Our team followed the same proven process we used throughout the home, delivering consistent colors, clean lines, and a finished look that brought the entire project across the finish line.

Project Overview

City: O'Fallon
Customer Name:

Elledge

Project Type: Interior
Type of Property: House
Neighborhood / Subdivision of Project:

Villas at Dardenne Prairie

Service: Interior Painting, Wallpaper Removal
Project Timeline:

2 Days

Project Completion Date:

January 9, 2026

Paint, Colors, and Materials

Substrates: Walls, Woodwork
Colors Used: Standard White, SW6457, SW7601
Paint Line: Sherwin Williams
Total Square Ft. Painted: 1388

Before and After Photos

The Challenge / Problem

The Elledge family was ready to complete the last touches of a full interior project we had been working on in phases over the past year. For this final phase, they needed two bedrooms painted with matching woodwork finishes, plus wallpaper removal and repainting in the hall bathroom. The priority was consistency, cleanliness, and an organized process that respected the home and ensured every detail was completed correctly.

The Solution / Approach

To keep this final phase efficient and consistent with the previous work completed in the home, we used a dedicated project folder that documented the customer’s preferences, selections, and optional areas. This allowed our project lead to follow a detailed checklist and confirm each item was completed through the final day of the project.

Upstairs Bedroom

  • Wall Painting (2 coats)
  • Protect surrounding areas with drop cloths, plastic, paper, and tape
  • Patch minor holes and spot prime as needed
  • Apply 2 coats of Sherwin-Williams finish paint to walls
  • Clean up the area
  • Woodwork Painting
  • Scuff sand, clean, caulk, and spot prime as needed
  • Apply 1 coat of WhiteB1 semi-gloss finish paint to baseboards and door frames

Lower Level Bedroom

  • Wall Painting (2 coats)
  • Protect surrounding areas with drop cloths, plastic, paper, and tape
  • Patch minor holes and spot prime as needed
  • Apply 2 coats of Sherwin-Williams finish paint to the walls
  • Clean up the area
  • Woodwork Painting
  • Scuff sand, clean, caulk, and spot prime as needed
  • Apply 1 coat of WhiteB1 semi-gloss finish paint to baseboards and door frames

Hall Bathroom

  • Wallcovering Removal + Painting
  • Protect surrounding areas with drop cloths, plastic, paper, and tape
  • Remove all wall covering, scrub adhesive, and patch minor holes
  • Apply 1 coat of oil primer to walls
  • Apply 2 coats of Sherwin-Williams finish paint to all walls

Results / Outcome

This final phase delivered the clean, cohesive finish the Elledge family needed to complete their full interior project. The bedrooms received smooth, even wall coverage with crisp trim lines, and the hall bathroom was fully refreshed with wallpaper removed, properly primed, and repainted for a clean, updated look. Most importantly, the project stayed organized and consistent with the work completed in earlier phases, so the entire home now feels finished and pulled together.

The Elledge family has trusted HBP Painting Contractors for years, and we genuinely appreciate the relationship we’ve built with them over time. It means a lot when homeowners bring us back project after project, and we look forward to being their go-to team for whatever they tackle next.